2D drawing · DWG/DXF

Redline → Revision B

REDLINE · REV B · A3
Feuille A-101 indice B, redlines intégrés avec nuages de révision
Feuille A-101 annotée au stylo rouge (redlines de chantier)
REDLINERÉV B

Download the rev B PDF (A3) ↗

Background

Full revision cycle on a 71 m² two-bedroom unit, the everyday workflow of a project team: first issue (rev A: furniture plan + dimension plan with door/window schedules), red-pen site markups (partition moved 300 mm, door added, window enlarged, corrected dimensions), then revision B issued with revision clouds, B triangles, updated schedules and the revision line “B — Site redlines incorporated”. Sheets in English with Indonesian subtitles (Denah). Demonstration project — not for construction.

Tools

2D drafting (DWG/DXF) · Python scripting (ezdxf) · A3 PDF plots @ 1:50

Deliverables

DXF / DWG · 2 A3 sheets, rev B · Before/after redline set

Next project →Request a quote